Mr. Terry made the #repairs, prime and placed the finishing coat. #ironworkrepairs
Saturday, March 29, 2014
Friday, March 28, 2014
Basic Gate Repair
Here is Mr. Terry making #repairs on this #gate. Next step...refreshing the primer and finishing coat. #bedfordstuyvesantironwork
Thursday, March 27, 2014
Mr. Riley's Entrance Gate Fabrication
Here is Mr. Riley fabricating an entrance #gate. View his work at https://youtu.be/zNokO6b11ms. Contact us NOW for your #ironworkrepairs at 718 602-2819. #weldingrepairsny
Wednesday, March 26, 2014
Finishing Coat On A Landmark Style Arrows On A Gate
Mr. Terry placed the finishing coat on this #gate with the landmark style arrows. Call us NOW at 718 602-2819 for a FREE QUOTE. #fireescaperepairsny
Tuesday, March 25, 2014
Monday, March 24, 2014
Stationary Window Guard Finished
Here is another basic stationary window guard that has just been fabricated and painted by Mr. Terry. #brownstoneironwork
Saturday, March 22, 2014
Basic Air Conditioning Box Window Guard
Here is the basic air conditioning box #windowguard drying fabricated by Mr. Terry. #ironworkrepairs.com
Friday, March 21, 2014
Finished Basic Stationary Window Guard
Here's one of the basic stationary window guards finished in black paint fabricated by Mr. Terry. #fireescaperepairsny
Thursday, March 20, 2014
Basic Gate Finished.
Here's a basic gate that has been fabricated by Mr. Terry drying so that it can be installed. #bedfordstuyvesantironwork.com
Wednesday, March 19, 2014
Decorative Railing Installation
Here is the railing Mr. Terry was working on. I was able to take a photo before it was taken to be installed today. #brownstoneironwork
Tuesday, March 18, 2014
Grinding Down A Railing
Here is Mr.Terry is grinding down a railing so that it can be installed tomorrow. View his work.on our YouTube page at: https://youtu.be/eDEGBIGEwy8 #ironworkrepairs
Monday, March 17, 2014
More Decorative Stationary Window Guards
Here are more of the decorative stationary window guards our apprentice Mr. Riley fabricated. #windowguardsny
Saturday, March 15, 2014
Friday, March 14, 2014
Thursday, March 13, 2014
Flat Style Cellar Door Fabrication
A client of ours needed this flat style #cellardoor immediately therefore, Mr. Terry made it the same day. #cellardoorsny
Wednesday, March 12, 2014
Bowed and Escape Window Guard Combination Installation
Our installers finished installing this decorative bowed and escape #windowguard (fabricated by Mr. Terry) before it began to rain today. #windowguardsny
Tuesday, March 11, 2014
Decorative Bowed Window Guard Installed
Here is the decorative bowed #windowguard installed by our installers that Mr. Terry fabricated. #windowguardsny
Monday, March 10, 2014
Saturday, March 8, 2014
Friday, March 7, 2014
Our Property's Perimeter Fence
Mr. Terry finished the perimeter fence section for our shop. Next....Installation.
Monday, March 3, 2014
Roof Hatch Finishing Paint
Mr. Riley finished putting the finishing coat on this #roofhatch that Mr. Terry fabricated. Call NOW fpr your FREE QUOTE. #weldingrepairsny